Skip to content
GateSetu

GateSetu for ready-mix concrete plants

An RMC plant already knows which mixers should go out today. What it lacks is a record of which ones actually went, when, and whether they came back empty.

The problem at the gate

  • Mixers leaving loaded outside the delivery schedule.
  • Diesel and hours billed for trips that never happened, or trips that happened but were never billed.
  • Night pours that need trucks out at 3 AM, mixed with trucks that should not be out at 3 AM.
  • Multiple plants, one owner, one phone.

What GateSetu gives you

  • Exact out and in times for every mixer, paired into trips with duration.
  • After-hours alerts that you can pause for a scheduled night pour with one tap.
  • A plant switcher in the app for owners with more than one site.
  • Per-vehicle trip history to settle transporter and driver disputes.
GateSetu Movements screen listing trucks with time, direction, number plate and Loaded or Empty tags, several marked After hours

A typical night message

22 mixers out · 22 in. ⚠️ MH14CX4521: 5 trips (usual 3). ⚠️ 3 movements after 9:00 PM — night pour paused until 6:00 AM.

21:00 ✓✓

All use cases

Same camera, same box, same report. What changes is which truck movement costs you money. Pick your kind of plant.

Talk to us about your plant

Tell us the plant type and where it is. We will tell you what the install looks like and what it costs.

Powered by Aariko Systems

WhatsApp us